OPTIMALISASI PRODUKSI DENGAN MENGANALISIS PEKERJAAN MENGGUNAKAN METODE MOST (Studi Kasus PT. X di Palembang)

  • Zahri A
  • Makmuri M
N/ACitations
Citations of this article
36Readers
Mendeley users who have this article in their library.

Abstract

A job is completed efficiently would say when lasted the shortest completion time. Measuring success of a production system in the industry are usually expressed in terms of productivity or the size of the input and output generated. Measurement standard at this time are made directly by the method stopwatch and indirectly with MOST methods (Maynard Operation Sequence Technique). Results of measurements using a standard time stop watch is 179,62 Second, with MOST measurements before the analysis is 123,73, most after the analisis is 75,25 second. Raw output using the old work is 200 Unit newspaper first hour , and use the most is the raw output of 478 Unit newspaper first hour. Seeing the results of the study suggested that the company may consider to perform the application of research results have been obtained

Cite

CITATION STYLE

APA

Zahri, A., & Makmuri, M. K. (2019). OPTIMALISASI PRODUKSI DENGAN MENGANALISIS PEKERJAAN MENGGUNAKAN METODE MOST (Studi Kasus PT. X di Palembang). Jurnal Tekno, 16(1), 1–16. https://doi.org/10.33557/jtekno.v16i1.356

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free