In this paper, basic concepts of process analysis such as flow time, inventory, bottleneck, labour cost and utilization are illustrated first. The effect of bottleneck on the results of a business are especially emphasized. In the next section, tools on productivity measurement; KPI (Key Performance Indicators) Tree, OEE (Overall Equipment Effectiveness) and Takt Time are introduced and exemplified. KPI tree is a diagram on which we can visualize all the variables of an operation which are driving financial results through cost and profit. OEE is a tool to measure a potential extra capacity of an equipment or an employee. Takt time is a tool to determine the process flow rate according to the customer demand. KPI tree is studied through the whole process while OEE is exemplified for a stenter frame machine which is the most important machine (and usually the bottleneck) and the most expensive investment in a finishing plant. Takt time is exemplified for the quality control department. Finally quality tools, six sigma, control charts and jidoka are introduced. Six sigma is a tool to measure process capability and by the way probability of a defect. Control chart is a powerful tool to monitor the process. The idea of jidoka (detect, stop and alert) is about alerting the people that there is a problem in the process.
CITATION STYLE
Maralcan, A., & Ilhan, I. (2017). Operations management tools to be applied for textile. In IOP Conference Series: Materials Science and Engineering (Vol. 254). Institute of Physics Publishing. https://doi.org/10.1088/1757-899X/254/20/202005
Mendeley helps you to discover research relevant for your work.