Development of the routine for rainfall-runoff model is described. Experiences from field investigation that have contributed to the work are briefly discussed. In the snow routine, snow accumulation and snowmelt are simulated using daily totals of precipitation and mean daily temperatures. The application of the model of a 2178 km**2 forested basin in central Sweden is shown. A critical study of the interaction and effects of the parameters is carried out.
CITATION STYLE
Bergstrom, S. (1975). DEVELOPMENT OF A SNOW ROUTINE FOR THE HBV-2 MODEL. Nord Hydrol, 6(2), 73–92. https://doi.org/10.2166/nh.1975.0006
Mendeley helps you to discover research relevant for your work.