Bi-Objective Re-Entrant Hybrid Flow Shop Scheduling considering Energy Consumption Cost under Time-of-Use Electricity Tariffs

35Citations
Citations of this article
19Readers
Mendeley users who have this article in their library.

This article is free to access.

Abstract

Re-entrant hybrid flow shop scheduling problem (RHFSP) is widely used in industries. However, little attention is paid to energy consumption cost with the raise of green manufacturing concept. This paper proposes an improved multiobjective ant lion optimization (IMOALO) algorithm to solve the RHFSP with the objectives of minimizing the makespan and energy consumption cost under Time-of-Use (TOU) electricity tariffs. A right-shift operation is then used to adjust the starting time of operations by avoiding the period of high electricity price to reduce the energy consumption cost as far as possible. The experimental results show that IMOALO algorithm is superior to multiobjective ant lion optimization (MOALO) algorithm, NSGA-II, and MOPSO in terms of the convergence, dominance, and diversity of nondominated solutions. The proposed model can make enterprises avoid high price period reasonably, transfer power load, and reduce the energy consumption cost effectively. Meanwhile, parameter analysis indicates that the period of TOU electricity tariffs and energy efficiency of machines have great impact on the scheduling results.

Cite

CITATION STYLE

APA

Geng, K., Ye, C., Dai, Z. H., & Liu, L. (2020). Bi-Objective Re-Entrant Hybrid Flow Shop Scheduling considering Energy Consumption Cost under Time-of-Use Electricity Tariffs. Complexity, 2020. https://doi.org/10.1155/2020/8565921

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free