ANALISIS TOTAL PRODUCTIVE MAINTENANCE DENGAN METODE OEE DAN FMEA PADA MESIN EXTRUDER GW-350

  • Siagian D
  • Iwan Nugraha Gusniar
  • Iman Dirja
N/ACitations
Citations of this article
40Readers
Mendeley users who have this article in their library.

Abstract

An industrial company that specializes in plastics, with the basic ingredients of PolyEthylene Terephthalate, PolyPropylene, and Hight Impact Polystyrene, the product is a plastic plate that is produced through the operation of the Extruder machine. Total Productive Maintenance (TPM) is one method of analyzing a machine and will help research the effectiveness of a machine with the help of other methods such as Overall Equipment Effectiveness (OEE) and Failure Mode and Effect Analysis (FMEA). Based on the quantitative analysis of the OEE calculation, the OEE value of the Extruder 1 GW-350 machine is obtained with an average calculation of 79.35%. Based on qualitative analysis using FMEA, the RPN failure mode score on the Extruder 1 GW-350 engine was obtained. The highest RPN value is the printer is unstable (die) at 240.

Cite

CITATION STYLE

APA

Siagian, D., Iwan Nugraha Gusniar, & Iman Dirja. (2022). ANALISIS TOTAL PRODUCTIVE MAINTENANCE DENGAN METODE OEE DAN FMEA PADA MESIN EXTRUDER GW-350. Steam Engineering, 4(1), 14–20. https://doi.org/10.37304/jptm.v4i1.5343

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free