The Klagshamn wastewater treatment plant is operated with extended nutrient removal. The process configuration is based on pre-precipitation and postdenitrification in a single sludge activated sludge system. As the nitrogen removal at the plant is strongly affected by the sludge age, the capacity of the system should be increased if the load of particulate material on the biological treatment is decreased.
CITATION STYLE
Nyberg, U., Andersson, B., Aspegren, H., & Ødegaard, H. (1994). The Use of Polymer in the Pre-precipitation Step of a Wastewater Treatment System for Extended Nutrient Removal. In Chemical Water and Wastewater Treatment III (pp. 211–219). Springer Berlin Heidelberg. https://doi.org/10.1007/978-3-642-79110-9_15