A Distributed Blocking Flowshop Scheduling with Setup Times Using Multi-Factory Collaboration Iterated Greedy Algorithm

7Citations
Citations of this article
7Readers
Mendeley users who have this article in their library.

Abstract

As multi-factory production models are more widespread in modern manufacturing systems, a distributed blocking flowshop scheduling problem (DBFSP) is studied in which no buffer between adjacent machines and setup time constraints are considered. To address the above problem, a mixed integer linear programming (MILP) model is first constructed, and its correctness is verified. Then, an iterated greedy-algorithm-blending multi-factory collaboration mechanism (mIG) is presented to optimize the makespan criterion. In the mIG algorithm, a rapid evaluation method is designed to reduce the time complexity, and two different iterative processes are selected by a certain probability. In addition, collaborative interactions between cross-factory and inner-factory are considered to further improve the exploitation and exploration of mIG. Finally, the 270 tests showed that the average makespan and RPI values of mIG are 1.93% and 78.35% better than the five comparison algorithms on average, respectively. Therefore, mIG is more suitable to solve the studied DBFSP_SDST.

Cite

CITATION STYLE

APA

Zhang, C., Han, Y., Wang, Y., Li, J., & Gao, K. (2023). A Distributed Blocking Flowshop Scheduling with Setup Times Using Multi-Factory Collaboration Iterated Greedy Algorithm. Mathematics, 11(3). https://doi.org/10.3390/math11030581

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free