Beneficial Effects of 3D BIM for Pre-Empting Waste during the Planning and Design Stage of Building and Waste Reduction Strategies

12Citations
Citations of this article
132Readers
Mendeley users who have this article in their library.

Abstract

The use of various tools for construction waste management throughout the planning and design (P&D) stage has several advantages. According to some research, building information modelling, or BIM, could be a valuable tool for predicting waste. This paper discusses how BIM could be used for pre-empting waste and reducing the course of the planning and design process of constructing a building. In Malaysia, a questionnaire survey of 340 construction experts was undertaken. Simultaneously, a regression analysis was carried out in order to determine the impact of BIM on the management of construction waste during the planning and design stage. This research could help many stakeholders in the construction industry to recognise various aspects of waste management, beginning with the planning and design stage of a project, which can be represented by designing a model that can be applied to mitigate waste during the construction of a building.

Cite

CITATION STYLE

APA

Mohammed, M., Shafiq, N., Al-Mekhlafi, A. B. A., Al-Fakih, A., Zawawi, N. A., Mohamed, A. M., … Al-Nini, A. (2022). Beneficial Effects of 3D BIM for Pre-Empting Waste during the Planning and Design Stage of Building and Waste Reduction Strategies. Sustainability (Switzerland), 14(6). https://doi.org/10.3390/su14063410

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free