Phase shift torquemeters for gas turbine development and monitoring

25Citations
Citations of this article
16Readers
Mendeley users who have this article in their library.

Abstract

Multipole phase shift torquemeters now measure shaft power to 0.1% accuracy in R & D applications, and to 1.0% when designed for permanent installation, both at confidence levels of 95%. The total installed power to date is 2 million kW, and over 2 million hours have been logged with good reliability. They are in service at speeds up to 90,000 RPM and powers of 50MW. The paper outlines ways of ensuring credibility, and describes typical designs for R & D use, and for permanent installation. It concludes that the application problems are largely those of transmission engineering.

Cite

CITATION STYLE

APA

Van Millingen, R. D., & Van Millingen, J. D. (1991). Phase shift torquemeters for gas turbine development and monitoring. In Proceedings of the ASME Turbo Expo (Vol. 5). American Society of Mechanical Engineers (ASME). https://doi.org/10.1115/91-GT-189

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free