The multi-agent method for real time production resource-scheduling problem

1Citations
Citations of this article
4Readers
Mendeley users who have this article in their library.
Get full text

Abstract

An operational scheduling method of production resources for enterprises has been analyzed and is being proposed. In order to assemble a client’s order, it is necessary to produce each detail by making the number of technological operations via an appropriate production resource. For scheduling and managing the production process, it is necessary to define the whole structure of the final assembly with a technology map. This representation is proposed by using a special ontological definition, and give the example for an enterprise producing electrical products. The process of scheduling has a high level of complexity due to the variety of types of resources used, and the dependence of production processes on many factors and conditions. Also considered real time events and each time getting information about a new fact of processing of each detail on each resource, the current production plan has to be rescheduled. Traditional methods for solving the problem are not possible using in real time scheduling, which is why it is proposed the multi-agent approach for that task. The developed system based on the proposed method is used by the real enterprise produces electrical products in Samara city, where, as a result, the number of delays in the execution of production orders was reduced by 10%.

Cite

CITATION STYLE

APA

Lada, A., & Smirnov, S. (2019). The multi-agent method for real time production resource-scheduling problem. In Studies in Systems, Decision and Control (Vol. 199, pp. 103–111). Springer International Publishing. https://doi.org/10.1007/978-3-030-12072-6_10

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free