Ground settlement model for excavation of a non-partial pressure and shallow buried double-arch tunnel

4Citations
Citations of this article
3Readers
Mendeley users who have this article in their library.
Get full text

Abstract

The ground settlement model due to tunnel's excavation was summarized in this paper. Firstly, the geological characteristics of a double-arch tunnel in Jinliwen Expressway are investigated and analyzed, which mainly act as discontinuity. Especially, settlement pattern during excavation of such a double-arch tunnel with non-partial pressure and shallow bury was taken out by data analysis from those monitoring information. After ground settlement model and its increment model following the each step of tunnel's excavation were built, the difference of forecasting between single tunnel and double-arch tunnel was shown. Secondly, the ground settlement model was testified by comparing between forecasting and field data. Thus, theoretical basic to avoid overmuch settlement during excavation of such a double-arch tunnel was provided. © 2008 Science Press Beijing and Springer-Verlag GmbH Berlin Heidelberg Geotechnical Engineering for Disaster Mitigation and Rehabilitation.

Cite

CITATION STYLE

APA

Wei, J., & Sun, S. (2008). Ground settlement model for excavation of a non-partial pressure and shallow buried double-arch tunnel. In Geotechnical Engineering for Disaster Mitigation and Rehabilitation - Proceedings of the 2nd International Conference GEDMAR08 (pp. 942–948). Springer-Verlag GmbH and Co. KG. https://doi.org/10.1007/978-3-540-79846-0_124

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free