Analisa Perencanaan Pembangkit Listrik Tenaga Surya Atap dengan Sistem Hybrid di PT. Koloni Timur

  • Sudarjo N
  • Haddin M
  • Suprajitno A
N/ACitations
Citations of this article
78Readers
Mendeley users who have this article in their library.

Abstract

This study discusses the Planning of a Rooftop Solar Power Plant with a Hybrid System at PT East Colony Kudus. The model is set as a PLTS whose solar panels are adjusted to the roof area of the building. This PLTS is functioned as a new renewable energy resource (EBT) in the form of a hybrid between PLTS and PLN's electrical energy source, this is done to help supply electricity. Parameters determined include: roof area, solar panel capacity, inverter capacity, battery capacity and payback period. The results show that PLTS with a total of 80 solar panels installed with a capacity of each panel 405 Watt peak, then obtained a power capacity of 32.4 kilo Watt peak which is divided into 5 arrays, with a solar charger controller and inverter using a 10kW capacity of 5 units, 80 batteries with a capacity of 400Ah. So that PLTS is able to contribute 39.3% of the total power needed by PT East Colony (electric power from PLN is 60.7%). This hybrid payback period will return after 8 years and 7 months.

Cite

CITATION STYLE

APA

Sudarjo, N. H., Haddin, M., & Suprajitno, A. (2022). Analisa Perencanaan Pembangkit Listrik Tenaga Surya Atap dengan Sistem Hybrid di PT. Koloni Timur. Elektrika, 14(1), 20. https://doi.org/10.26623/elektrika.v14i1.3784

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free