Minimizing the makespan in flowshop scheduling for sustainable rubber circular manufacturing

4Citations
Citations of this article
30Readers
Mendeley users who have this article in their library.

Abstract

It is estimated that 1 billion waste tires are generated every year across the globe, yet only 10% are being processed, and much rubber waste is yielded during manufacturing. These waste tires and rubber scraps are poisonous to the environment when processed via incineration and land-fill. Rubber circular manufacturing is an effective solution that reduces not only rubber waste but also raw material costs. In this paper we propose a two-line flowshop model for the circular rubber manufacturing problem (CRMP), where the job sequence of two production lines is appropriately aligned to obtain the shortest makespan while guaranteeing that sufficient rubber waste yielded in the first line is ready to be reused for circular production in the second line. A genetic algorithm (GA) is developed, and the design of its genetic operations is customized to the CRMP context to achieve efficient and effective evolution. The experimental results with both real and synthetic da-tasets show that the GA significantly surpasses two heuristics in the literature by delivering the minimum makespan, which is 3.4 to 11.2% shorter than those obtained by the two competing methods.

Cite

CITATION STYLE

APA

Yin, P. Y., Chen, H. M., Cheng, Y. L., Wei, Y. C., Huang, Y. L., & Day, R. F. (2021). Minimizing the makespan in flowshop scheduling for sustainable rubber circular manufacturing. Sustainability (Switzerland), 13(5), 1–18. https://doi.org/10.3390/su13052576

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free