Multi-Objective Optimal Scheduling of Generalized Water Resources Based on an Inter-Basin Water Transfer Project

2Citations
Citations of this article
11Readers
Mendeley users who have this article in their library.

Abstract

For inter-basin water transfer (IBWT) projects, the conflict between social, economic, and ecological objectives makes water allocation processes more complex. Specific to the problem of water resource conflict in IBWT projects, we established an optimal allocation model of generalized (conventional) water resources (G (C) model) to demonstrate the advantages of the G model. The improved multi-objective cuckoo optimization algorithm (IMOCS) was applied to search the Pareto frontiers of the two models under normal, dry, and extremely dry conditions. The optimal allocation scheme set of generalized (conventional) water resources (G (C) scheme set) consists of ten Pareto optimal solutions with the minimum water shortage selected from the Pareto optimal solutions of the G (C) model. The analytic hierarchy process (AHP) combined with criteria importance using the inter-criteria correlation (CRITIC) method was used to assign weights of evaluation indexes in the evaluation index system. The non-negative matrix method was employed to evaluate the G (C) scheme set to determine the best G (C) scheme for the Jiangsu section of the South-to-North Water Transfer (J-SNWT) Project. The results show that (1) the Pareto frontier of the G model is better than that of the C model, and (2) the best G scheme shows better index values compared to the best C scheme. The total water shortages are reduced by 254.2 million m3 and 827.9 million m3 under the dry condition, respectively, and the water losses are reduced by 145.1 million m3 and 141.1 million m3 under the extremely dry condition, respectively. These findings could not only provide J-SNWT Project managers with guidelines for water allocation under normal, dry, and extremely dry conditions but also demonstrate that the G model could achieve better water-allocation benefits than the C model for inter-basin water transfer projects.

References Powered by Scopus

Engineering optimisation by cuckoo search

2198Citations
N/AReaders
Get full text

Water management: Current and future challenges and research directions

859Citations
N/AReaders
Get full text

Multiobjective cuckoo search for design optimization

815Citations
N/AReaders
Get full text

Cited by Powered by Scopus

Optimal Operation of Tidal-Sluice-Pump Based on “Flexible Freshwater Reservoir” Concept

0Citations
N/AReaders
Get full text

Coupling Different Machine Learning and Meta-Heuristic Optimization Techniques to Generate the Snow Avalanche Susceptibility Map in the French Alps

0Citations
N/AReaders
Get full text

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Cite

CITATION STYLE

APA

Xi, H., Xie, Y., Liu, S., Mao, Q., Shen, T., & Zhang, Q. (2023). Multi-Objective Optimal Scheduling of Generalized Water Resources Based on an Inter-Basin Water Transfer Project. Water (Switzerland), 15(18). https://doi.org/10.3390/w15183195

Readers' Seniority

Tooltip

PhD / Post grad / Masters / Doc 3

43%

Lecturer / Post doc 2

29%

Professor / Associate Prof. 1

14%

Researcher 1

14%

Readers' Discipline

Tooltip

Engineering 2

40%

Nursing and Health Professions 1

20%

Environmental Science 1

20%

Linguistics 1

20%

Article Metrics

Tooltip
Mentions
Blog Mentions: 1
News Mentions: 1

Save time finding and organizing research with Mendeley

Sign up for free