Calculation of the Chilling Requirement for Air Conditioning in the Excavation Roadway

3Citations
Citations of this article
6Readers
Mendeley users who have this article in their library.
Get full text

Abstract

To effectively improve the climate conditions of the excavation roadway in coal mine, the calculation of the chilling requirement taking air conditioning measures is extremely necessary. The temperature field of the surrounding rock with moving boundary in the excavation roadway was numerically simulated by using finite volume method. The unstable heat transfer coefficient between the surrounding rock and air flow was obtained via the previous calculation. According to the coupling effects of the air flow inside and outside air duct, the differential calculation mathematical model of air flow temperature in the excavation roadway was established. The chilling requirement was calculated with the selfdeveloped computer program for forecasting the required cooling capacity of the excavation roadway. A good air conditioning effect had been observed after applying the calculated results to field trial, which indicated that the prediction method and calculation procedure were reliable.

Cite

CITATION STYLE

APA

Qin, Y., Kong, S., Liu, W., Jiang, Z., & Wu, J. (2015). Calculation of the Chilling Requirement for Air Conditioning in the Excavation Roadway. Journal of Engineering Science and Technology Review, 8(3), 91–97. https://doi.org/10.25103/JESTR.083.13

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free