Selecting and initializing representative days for generation and transmission expansion planning with high shares of renewables

1Citations
Citations of this article
1Readers
Mendeley users who have this article in their library.
Get full text

Abstract

Generation and Transmission Expansion Planning (GTEP) to achieve decarbonisation targets in the power sector requires installing relevant shares of production from Renewable Energy Sources (RES). GTEP optimization models determine expansion plans over a long-term horizon so as to minimize the total investment and operation cost. In the presence of high shares of non-dispatchable RES power plants, operation costs must be evaluated taking into account the different operating conditions due to the intermittency of RES power generations. In this work we consider a GTEP model for a power system based on thermal, solar and wind power generation and we introduce a novel approach to select representative days (RDs), discretized in hours, in order to obtain accurate estimates of the operational costs. The RDs are not connected, in order to get a decomposable problem. A procedure is introduced to assign the ON/OFF status of every thermal unit at the beginning of each RD. Numerical results on a test case of suitable dimension show that the proposed method provides expansion plans very close to those obtained by the complete hourly model, while dramatically reducing computational costs.

Cite

CITATION STYLE

APA

Micheli, G., Vespucci, M. T., Stabile, M., & Cortazzi, A. (2021). Selecting and initializing representative days for generation and transmission expansion planning with high shares of renewables. In AIRO Springer Series (Vol. 5, pp. 321–334). Springer Nature. https://doi.org/10.1007/978-3-030-63072-0_25

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free