Risk level assessment on road construction's contractors using cultural - Professionalism based approach

6Citations
Citations of this article
42Readers
Mendeley users who have this article in their library.

Abstract

This study aimed to analyze the characteristics of potential risk and the risk levels to the contractors in a road construction project and its impact on service providers (contractors), and to make a risk assessment model with multi-criteria to the contractors in road construction projects. Objective contractors road construction is not optimal due to non-performance risk management in the project with the right. This study is done in the form of a survey by capturing the opinions or perceptions, experiences and attitudes of respondents implementing on road construction. Parameters indicating the risk of road construction projects were model and tested using the methodology of Expert Choice to describe, quantify and demonstrate the risk level, allocation, and response in road construction projects with different risk variables. Results of the study firstly identified 281 risks for the road construction including 57 non-Technical, 39 technical, 36 financial, 76 cultural, 38 work health and safety management aspect and 35 environmental aspects. Secondly the weight of the objective indicators on the risk of road construction work was assessed for cost 0.370, time 0.252, quality 0.184, work health and safety management 0.120, and environmental 0.074. The weight of objective criteria for cost risks was also assessed for non-Technical 0.113, technical 0.247, financial 0.185, cultural 0.304, work health and safety management 0.083 and environmental 0.068 aspects. Thirdly risk map was divided into 116 extreme risks (41.28%), 153 high risks (54.45%), 12 medium risks (4.27%) and none of the low risk. Fourthly risk allocation was determined for contractors 53.19 (55.88%), sharing risks 22.30 (23.58%) and owners 19.52 (20.55%). Finally alternatives of strategy to handle the response risk for road construction projects covered 36. 03 risk retention, 19.82 risk reduction, 26. 47 risk avoidance and 16.90 risk transfer.

References Powered by Scopus

What causes cost overrun in transport infrastructure projects?

478Citations
N/AReaders
Get full text

Cited by Powered by Scopus

Prediction of long-term volumetric parameters of asphalt concrete binder course mixture using artificial ageing test

25Citations
N/AReaders
Get full text

Level vulnerability damage of pavement using Pavement Condition Index method

7Citations
N/AReaders
Get full text

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Cite

CITATION STYLE

APA

Bustan, B., Sammang, L., Nurali, & Ramli, I. (2016). Risk level assessment on road construction’s contractors using cultural - Professionalism based approach. International Journal of Civil Engineering and Technology, 7(1), 199–210. https://doi.org/10.15224/978-1-63248-083-5-94

Readers over time

‘17‘18‘19‘20‘21‘22‘23‘24‘2506121824

Readers' Seniority

Tooltip

Lecturer / Post doc 6

40%

PhD / Post grad / Masters / Doc 5

33%

Professor / Associate Prof. 2

13%

Researcher 2

13%

Readers' Discipline

Tooltip

Engineering 8

44%

Nursing and Health Professions 5

28%

Agricultural and Biological Sciences 3

17%

Medicine and Dentistry 2

11%

Save time finding and organizing research with Mendeley

Sign up for free
0