Simulation on the interruptible load contract

0Citations
Citations of this article
6Readers
Mendeley users who have this article in their library.
Get full text

Abstract

Interruptible load management (ILM) is an important part of Demand Side Management (DSM), especially in power market. It has deep influences on reliability and economical operation of power system. How to use a rational model to simulate the ILM becomes a hot topic in China. This paper gives the optimal purchase model of interruptible contract and sets a reasonable selected rule, i.e. the interruptible load should be priorly scheduled in the period with maximal shortage capacity. Based on the rule, the heuristic method is employed to solve the problem. Simulation results of real power system demonstrate the usefulness of the proposed model. © Springer-Verlag 2004.

Cite

CITATION STYLE

APA

Wang, J., Wang, X., & Du, T. (2004). Simulation on the interruptible load contract. Lecture Notes in Computer Science (Including Subseries Lecture Notes in Artificial Intelligence and Lecture Notes in Bioinformatics), 3314, 825–830. https://doi.org/10.1007/978-3-540-30497-5_128

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free