Pengurangan Lead Time Analisa Kemasan Primer Flexy Bag dengan Metode Single Minute Exchange of Dies (SMED) di Industri Farmasi X

  • Haifa A
N/ACitations
Citations of this article
80Readers
Mendeley users who have this article in their library.

Abstract

Waste of time in the packaging analysis process can cause delays in the production process. This condition affects the speed in meeting consumer demand. Calculation of lead time analysis of packaging is important to calculate so that the release of packaging for production can be on time. In previous studies, an improvement that can be used to minimize waste is to reduce the internal setup time to an external setup using the single minute exchange of dies (SMED) method. This research was conducted experimentally by using observational data on testing parameters of packaging analysis from 1 batch number on 32 vat. Based on data from observations made on the primary packaging analysis of the flexy bag, there are 23 activities consisting of 18 internal activities and 5 activities that can be converted to external. The results of applying the SMED method in this study can reduce setup time by 58.06% or 13.18 hours. So we get time efficiency by minimizing internal activities.

Cite

CITATION STYLE

APA

Haifa, A. I. (2020). Pengurangan Lead Time Analisa Kemasan Primer Flexy Bag dengan Metode Single Minute Exchange of Dies (SMED) di Industri Farmasi X. Jurnal Inkofar, 1(1). https://doi.org/10.46846/jurnalinkofar.v1i1.157

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free