Monitoring and feedback for ground freezing and pile-support deep foundation pit

3Citations
Citations of this article
2Readers
Mendeley users who have this article in their library.
Get full text

Abstract

For ground freezing and pile-support deep foundation pit of south anchorage of Runyang Bridge, ground freezing made the mechanic state of foundation pit become complex. According structure character of ground freezing and pile-support deep foundation pit, and the engineering geological condition of site, the large safe monitoring system was built. This paper introduced engineering geological condition of site, structure of foundation pit and monitoring system. Analysis the change rule of several kinds of monitoring data, and the feedback analysis was made based on the construction monitoring, guarantee the safety and stability of ground freezing and pile-support deep foundation pit of south anchorage. The monitor result indicated the ground freezing and pile-support method is viable for deep foundation pit, and the experience was backlog for construction of similar engineering aftertime. © 2008 Science Press Beijing and Springer-Verlag GmbH Berlin Heidelberg Geotechnical Engineering for Disaster Mitigation and Rehabilitation.

Cite

CITATION STYLE

APA

Lu, J., Zhao, Y., & Yuan, B. (2008). Monitoring and feedback for ground freezing and pile-support deep foundation pit. In Geotechnical Engineering for Disaster Mitigation and Rehabilitation - Proceedings of the 2nd International Conference GEDMAR08 (pp. 702–708). Springer-Verlag GmbH and Co. KG. https://doi.org/10.1007/978-3-540-79846-0_89

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free