A framework of five-stream production system for megaprojects

8Citations
Citations of this article
37Readers
Mendeley users who have this article in their library.

Abstract

Construction projects, particularly megaprojects, tend to frequently fail in satisfying their budget, schedule, quality, and safety objectives. Two of the most notable systems that have been developed to enhance project performance are the Last Planner® System and Location-Based Management System. This paper builds on combining these two systems through proposing an integrative production system that can play a significant role in enhancing project performance, especially in the case of megaprojects. The proposed production system incorporates five cohesive streams: production planning, material flow, Built in Quality (BIQ)/Information flow, tracking flow, and safety flow. This paper discusses each of these five streams, at five different implementation levels throughout the project lifecycle, in the context of an ongoing successful megaproject. Finally, the paper concludes by listing four main success pillars that are needed for the proposed production system to flourish.

Cite

CITATION STYLE

APA

Ibrahim, M. W., Berghede, K., Thomack, D., Lampsas, P., Kievet, D., & Hanna, A. S. (2017). A framework of five-stream production system for megaprojects. In IGLC 2017 - Proceedings of the 25th Annual Conference of the International Group for Lean Construction (pp. 729–736). The International Group for Lean Construction. https://doi.org/10.24928/2017/0179

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free