This paper is focused on the extension of the OASIS (Optimal Advanced System for Integrated Strategies) in order to take into account the multi-objective nonlinear optimization technique for coordinated ramp metering. The multi-objective function includes two costs functions: traffic and safety (Risk model) indices. OASIS is revisited and off-line simulation studies are conducted on real test site corresponding to A6W France motorway located in the south part of “Ile de France” Motorway networks. Five consecutive on-ramps are considered for the control. The obtained results are very promising.
CITATION STYLE
Haj-Salem, H., Farhi, N., Lebacque, J. P., & Bhouri, N. (2018). Development of coordinated ramp-metering based on multi-objective nonlinear optimization functions: Traffic and safety. In Advances in Intelligent Systems and Computing (Vol. 572, pp. 334–354). Springer Verlag. https://doi.org/10.1007/978-3-319-57105-8_16
Mendeley helps you to discover research relevant for your work.