PERENCANAAN PENJADWALAN DAN PERSEDIAAN SPAREPART DENGAN METODE RELIABILITY CENTERED MAINTENANCE (RCM) DI PT.X

  • Siswanti E
N/ACitations
Citations of this article
25Readers
Mendeley users who have this article in their library.

Abstract

PT.X is a supplier company that manufactures plastic bottles. Currently PT.X has a production capacity of 4.3 million bottles per day. The production capacity can be met if the production machine running well and in a reliable state. PT.X not currently have a machine maintenance activities are laid out well. This often caused many damage occurs unscheduled engine which causes the cost of lost opportunity (opportunity cost) for the manufacture of products and the high costs of component inventory. The method used in solving the problem in this study is the use of Reliability Centered Maintenance analysis in determining the policy of treatment and then seek maintenance intervals based on the minimum cost. The results obtained are contained 8 components that have critical categories with each scheduled maintenance policy is age replacement, with this calculation obtained a saving of approximately 44% on inventory costs and increased reliability component approximately 42% -64%.

Cite

CITATION STYLE

APA

Siswanti, E. (2017). PERENCANAAN PENJADWALAN DAN PERSEDIAAN SPAREPART DENGAN METODE RELIABILITY CENTERED MAINTENANCE (RCM) DI PT.X. JURNAL TEKNIK INDUSTRI, 6(1). https://doi.org/10.25105/jti.v6i1.1528

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free