Improvement of evaluation of replacement cost of a fusion power plant

1Citations
Citations of this article
9Readers
Mendeley users who have this article in their library.

Abstract

A new model to evaluate the plant availability of a fusion reactor by considering the required cooling time before starting the scheduled replacement of in-vessel components was developed and incorporated in the tokamak system design code TPC-SCONE. Plant availability strongly depends on the electric output and decreases with increasing electric output. The plant availability does not much improve by advances in the physics or engineering design conditions. Consequently, the effect of the increase in the electric output on reducing the cost of electricity is diminished. Thus, proper selection of the electric output of a fusion reactor (especially for a DEMO reactor) is likely required to achieve the plant availability target.

Cite

CITATION STYLE

APA

Goto, T., Utoh, H., Someya, Y., Nakamura, M., Hiwatari, R., & Tobita, K. (2014). Improvement of evaluation of replacement cost of a fusion power plant. Plasma and Fusion Research, 9(SpecialIssue2). https://doi.org/10.1585/pfr.9.3405140

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free