Design Considerations for Cost-Effective Ozone Mass Transfer in Sidestream Systems

12Citations
Citations of this article
42Readers
Mendeley users who have this article in their library.
Get full text

Abstract

Ozone dissolution system design is important for meeting transfer efficiency (TE) goals. Large sidestream pump flow (L) and high venturi inlet pressure improves TE but increases operating cost. Ozone TE was examined at a 25 gpm (97-Lpm) pilot-scale sidestream system with (SSw-dg) and without (SSwo-dg) degas separation. Under constant ozone dose conditions, process operating parameters were varied including sidestream gas/liquid (G/L) ratio, venturi-inlet water pressure, venturi-outlet water pressure, feed gas pressure, and ozone gas concentration. Performance results included determination of TE, ozone exposure (CTHDT), and hydraulic detention time (THDT). Several design aspects of sidestream ozone systems were examined to improve mass transfer by using remixing devices, protecting ozone gas piping from corrosion, calculating sidestream ozone residual, and driving force for mass transfer. Moisture contamination of ozone supply lines may cause corrosion and/or decomposition of ozone gas that releases heat and destroys ozone. Ozone gas piping design is critical to prevent trapping water that might enter gas pipe during power outage or when units are offline. During plant operation below design flow, multiple constant speed pumps or variable speed pumps were evaluated to reduce overall operating costs.

Cite

CITATION STYLE

APA

Rakness, K. L., Hunter, G., Lew, J., Mundy, B., & Wert, E. C. (2018). Design Considerations for Cost-Effective Ozone Mass Transfer in Sidestream Systems. Ozone: Science and Engineering, 40(3), 159–172. https://doi.org/10.1080/01919512.2018.1424532

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free