In-pit crusher location as a dynamic location problem

23Citations
Citations of this article
28Readers
Mendeley users who have this article in their library.

Abstract

The cost efficiency and high reliability of semi-mobile or combined in-pit crushing-conveying (IPCC) and truck systems, compared to conventional truck-shovel systems alone, make them more attractive for use in modern mining operations. Semi-mobile systems, which are the most common systems in open-pit mining, combine the advantages of both systems such that fewer trucks are required, operating costs are lowered, and the operation is environmentally sound. One major aspect of utilizing this system is determining the location of the in-pit crasher and the timing of relocations. Facility Location models are rarely used in the mining sector, but these models may be used for solving the in-pit crusher location problem. To this end. the main parameters affecting the IPCC location in open pit mines are reviewed and examples given of how they are applied to a dynamic location-relocation problem. Subsequently, the model is implemented for Sungun copper mine in Iran and the number and the exact time of relocations of the IPCC units determined.

Cite

CITATION STYLE

APA

Paricheh, M., Osanloo, M., & Rahmanpour, M. (2017). In-pit crusher location as a dynamic location problem. Journal of the Southern African Institute of Mining and Metallurgy, 117(6), 599–607. https://doi.org/10.17159/2411-9717/2017/v117n6a11

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free