Time and resource management of residential apartment construction using building information modeling

4Citations
Citations of this article
84Readers
Mendeley users who have this article in their library.
Get full text

Abstract

To complete a project under the complicated situations, it is important to follow effective ways to use available tools and methods, taking into account present technology and management. Also, it is challenging to prepare accurate and achievable plans in large construction projects. Visualizing forms at an early stage in building design improves the ability of designers to deliver ideas and the capability to inspect and assess the methods helps to predict and optimize the actual presentation of the construction project. These different features form the basis for Building Information Modeling (BIM). The archetypal problems like budget overflow, lack of communication, cost overruns, overtime delays, rework can be minimized with the use of Building Information Modeling (BIM) tools for building design & resource management. In this paper, the concept of Building Information Modelling (BIM) is used for 3D modeling, which involves 4th dimension as Time (4D), 5th dimension of Cost (5D) of the project. A case study of G+5 residential apartment is presented for 3D BIM modeling and quantity take-off with the commercial software Autodesk Revit 2019. The 4D BIM carried out using Primavera P6 is explained with methodology for a case study. Further, Autodesk Navisworks Manage 2019 is used for 5D BIM, which includes a graphical presentation of the construction schedule and cost estimation of the case study.

References Powered by Scopus

Building information modeling (BIM): Trends, benefits, risks, and challenges for the AEC industry

1567Citations
N/AReaders
Get full text

A BIM-based construction quality management model and its applications

309Citations
N/AReaders
Get full text

The benefits, obstacles and problems of practical bim implementation

248Citations
N/AReaders
Get full text

Cited by Powered by Scopus

Systematic review of critical drivers for delay risk prediction: towards a conceptual framework for BIM-based construction projects

12Citations
N/AReaders
Get full text

Assessment of Building Information Modeling (BIM) as a Time and Cost-Saving Construction Management Tool: Evidence from Two-Story Villas in Jeddah

8Citations
N/AReaders
Get full text

BIM-based quantity takeoff: Current state and future opportunities

7Citations
N/AReaders
Get full text

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Cite

CITATION STYLE

APA

Narlawar, G. S., Chaphalkar, N. B., & Sandbhor, S. (2019). Time and resource management of residential apartment construction using building information modeling. International Journal of Innovative Technology and Exploring Engineering, 8(10), 4238–4246. https://doi.org/10.35940/ijitee.J9951.0881019

Readers' Seniority

Tooltip

PhD / Post grad / Masters / Doc 22

69%

Researcher 6

19%

Professor / Associate Prof. 2

6%

Lecturer / Post doc 2

6%

Readers' Discipline

Tooltip

Engineering 28

70%

Business, Management and Accounting 7

18%

Design 3

8%

Energy 2

5%

Save time finding and organizing research with Mendeley

Sign up for free