Production Scheduling System with Dynamic Lot Size in Case of Considering Set-up Time

  • Koike M
  • Tsumaya A
  • Matsui R
  • et al.
N/ACitations
Citations of this article
3Readers
Mendeley users who have this article in their library.
Get full text

Abstract

The dynamic scheduling management system architecture that is based on the parts and information packets unified technology is developed, and variable lot size production with the parts and packets unified technology is proposed. We assumed that each part or unit has a data career, which handle such as identification number, position of the part, state of the part. Using these data, progress of the project process is compared with the master schedule. If the difference arises between them, scheduling system dynamically reschedules with dynamic lot size to optimize the processes. A pilot system that realized our proposal is developed.

Cite

CITATION STYLE

APA

Koike, M., Tsumaya, A., Matsui, R., Morinaga, E., Wakamatsu, H., & Arai, E. (2008). Production Scheduling System with Dynamic Lot Size in Case of Considering Set-up Time. In Manufacturing Systems and Technologies for the New Frontier (pp. 289–292). Springer London. https://doi.org/10.1007/978-1-84800-267-8_59

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free