Improving online risk assessment with equipment prognostics and health monitoring

0Citations
Citations of this article
4Readers
Mendeley users who have this article in their library.
Get full text

Abstract

The current approach to evaluating the risk of nuclear power plant (NPP) operation relies on static probabilities of component failure, which are based on industry experience with the existing fleet of nominally similar light water reactors (LWRs). As the nuclear industry looks to advanced reactor designs that feature non-light water coolants (e.g., liquid metal, high temperature gas, molten salt), this operating history is not available. Many advanced reactor designs use advanced components, such as electromagnetic pumps, that have not been used in the US commercial nuclear fleet. Given the lack of rich operating experience, we cannot accurately estimate the evolving probability of failure for basic components to populate the fault trees and event trees that typically comprise probabilistic risk assessment (PRA) models. Online equipment prognostics and health management (PHM) technologies can bridge this gap to estimate the failure probabilities for components under operation. The enhanced risk monitor (ERM) incorporates equipment condition assessment into the existing PRA and risk monitor framework to provide accurate and timely estimates of operational risk.

Author supplied keywords

Cite

CITATION STYLE

APA

Coble, J., Liu, X., Briere, C., & Ramuhalli, P. (2016). Improving online risk assessment with equipment prognostics and health monitoring. In Lecture Notes in Mechanical Engineering (Vol. PartF4, pp. 141–149). Pleiades journals. https://doi.org/10.1007/978-3-319-27064-7_14

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free