In-pile testing of ITER first wall mock-ups at relevant thermal loading conditions

4Citations
Citations of this article
5Readers
Mendeley users who have this article in their library.
Get full text

Abstract

The paper describes the experimental technique and preliminary results of thermal fatigue testing of ITER first wall (FW) water-cooled mock-ups inside the core of the RBT-6 experimental fission reactor (RIAR, Dimitrovgrad, Russia). This experiment has provided simultaneous effect of neutron fluence and thermal cycling damages on the mock-ups. A PC-controlled high-temperature graphite ohmic heater was applied to provide cyclic thermal load onto the mock-ups surface. This experiment lasted for 309 effective irradiation days with a final damage level (CuCrZr) of 1 dpa in the mock-ups. About 3700 thermal cycles with a heat flux of 0.4-0.5 MW/m2 onto the mock-ups were realized before the heater fails. Then, irradiation was continued in a non-cycling mode. © 2009 Elsevier B.V. All rights reserved.

Cite

CITATION STYLE

APA

Litunovsky, N., Gervash, A., Lorenzetto, P., Mazul, I., & Melder, R. (2009). In-pile testing of ITER first wall mock-ups at relevant thermal loading conditions. Journal of Nuclear Materials, 386388(C), 979–982. https://doi.org/10.1016/j.jnucmat.2008.12.268

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free