Specification, installation and commissioning of a large industrial control system for the LEP2 cryogenics

  • Kuhn H
  • Juillerat A
  • Rabany M
 et al. 
  • 1

    Readers

    Mendeley users who have this article in their library.
  • 1

    Citations

    Citations of this article.

Abstract

CERN is upgrading the LEP e+-e-collider for energies above the Z0particle by installing super-conducting cavities. The cryogenic system attached to these cavities is controlled by a distributed, industrial control system, having been the object of a tender. The issues relate to the software specification, the management of the contract, the installation and the gradual commissioning of the system. The experience with a fully farmed- out solution is reported. © 1994.

Get free article suggestions today

Mendeley saves you time finding and organizing research

Sign up here
Already have an account ?Sign in

Find this document

Authors

  • H. K. Kuhn

  • A. C. Juillerat

  • M. Rabany

  • J. C. Wollès

Cite this document

Choose a citation style from the tabs below

Save time finding and organizing research with Mendeley

Sign up for free