CERN is upgrading the LEP e+-e- collider for energies above the Z0 particle by installing super-conducting cavities. The cryogenic system attached to these cavities is controlled by a distributed, industrial control system, having been the object of a tender. The issues relate to the software specification, the management of the contract, the installation and the gradual commissioning of the system. The experience with a fully farmed- out solution is reported. © 1994.
CITATION STYLE
Kuhn, H. K., Juillerat, A. C., Rabany, M., & Wollès, J. C. (1994). Specification, installation and commissioning of a large industrial control system for the LEP2 cryogenics. Nuclear Inst. and Methods in Physics Research, A, 352(1–2), 467–470. https://doi.org/10.1016/0168-9002(94)91572-5