Specification, installation and commissioning of a large industrial control system for the LEP2 cryogenics

1Citations
Citations of this article
1Readers
Mendeley users who have this article in their library.
Get full text

Abstract

CERN is upgrading the LEP e+-e- collider for energies above the Z0 particle by installing super-conducting cavities. The cryogenic system attached to these cavities is controlled by a distributed, industrial control system, having been the object of a tender. The issues relate to the software specification, the management of the contract, the installation and the gradual commissioning of the system. The experience with a fully farmed- out solution is reported. © 1994.

Cite

CITATION STYLE

APA

Kuhn, H. K., Juillerat, A. C., Rabany, M., & Wollès, J. C. (1994). Specification, installation and commissioning of a large industrial control system for the LEP2 cryogenics. Nuclear Inst. and Methods in Physics Research, A, 352(1–2), 467–470. https://doi.org/10.1016/0168-9002(94)91572-5

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free