Efficient heuristics for the workover rig routing problem with a heterogeneous fleet and a finite horizon

17Citations
Citations of this article
23Readers
Mendeley users who have this article in their library.
Get full text

Abstract

Onshore oil fields may contain hundreds of wells that use sophisticated and complex equipments. These equipments need regular maintenance to keep the wells at maximum productivity. When the productivity of a well decreases, a specially-equipped vehicle called a workover rig must visit this well to restore its full productivity. Given a heterogeneous fleet of workover rigs and a set of wells requiring maintenance, the workover rig routing problem (WRRP) consists of finding rig routes that minimize the total production loss of the wells over a finite horizon. The wells have different loss rates, need different services, and may not be serviced within the horizon. On the other hand, the number of available workover rigs is limited, they have different initial positions, and they do not have the same equipments. This paper presents and compares four heuristics for the WRRP: an existing variable neighborhood search heuristic, a branch-price-and-cut heuristic, an adaptive large neighborhood search heuristic, and a hybrid genetic algorithm. These heuristics are tested on practical-sized instances involving up to 300 wells, 10 rigs on a 350-period horizon. Our computational results indicate that the hybrid genetic algorithm outperforms the other heuristics on average and in most cases.

Cite

CITATION STYLE

APA

Ribeiro, G. M., Desaulniers, G., Desrosiers, J., Vidal, T., & Vieira, B. S. (2014). Efficient heuristics for the workover rig routing problem with a heterogeneous fleet and a finite horizon. Journal of Heuristics, 20(6), 677–708. https://doi.org/10.1007/s10732-014-9262-1

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free