Abstract
We consider a widespread branch-and-price approach to solve the multiple depot vehicle scheduling problem with time windows. We describe a dynamic time window reduction technique to speed up this approach. The time windows are transferred from nodes to arcs in order to take advantage of dual information and to tighten as much as possible the time variable domains. The performance of the proposed technique is evaluated through computational experiments on randomly generated instances involving several depots and up to 900 tasks. © 2008 Elsevier Ltd. All rights reserved.
Author supplied keywords
Cite
CITATION STYLE
Hadjar, A., & Soumis, F. (2009). Dynamic window reduction for the multiple depot vehicle scheduling problem with time windows. Computers and Operations Research, 36(7), 2160–2172. https://doi.org/10.1016/j.cor.2008.08.010
Register to see more suggestions
Mendeley helps you to discover research relevant for your work.