Research on Dynamic Optimization of a Critical Path Based on Stochastic Duration and the Earned Value Method

1Citations
Citations of this article
39Readers
Mendeley users who have this article in their library.
Get full text

Abstract

Critical paths are widely used in project schedule management, but most existing studies ignore the volatility and dynamic characteristics of project duration, which increases the risk of project implementation. This paper proposes a dynamic optimization model of random duration and the EVM (earned value method) based on critical path technology. The random duration based on a lognormal distribution is introduced into critical path technology, and the completion probability model is established to evaluate the fluctuation of the project completion schedule. Then, the earned value correction model is established and combined with performance indicators to improve the dynamic management system of proactive scheme scheduling and reactive scheme scheduling. The proposed method can fully consider the fluctuation and dynamics of the project duration, effectively reduce the errors caused by the uncertain fluctuation of the duration, and further improve scientific management and reduce management costs.

Cite

CITATION STYLE

APA

Cao, P., Li, D., Cao, Z., Huang, D., & Wang, J. (2025). Research on Dynamic Optimization of a Critical Path Based on Stochastic Duration and the Earned Value Method. Buildings, 15(8). https://doi.org/10.3390/buildings15081285

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free