Improved precedence preservation crossover for multi-objective job shop scheduling problem

24Citations
Citations of this article
35Readers
Mendeley users who have this article in their library.

This article is free to access.

Abstract

Over the last three decades, a great deal of research has been focused on solving the job-shop scheduling problem (JSSP). Researchers have emerged with a wide variety of approaches to solve this stubborn problem. Recently much effort has been concentrated on evolutionary techniques to search for the near-optimal solutions optimizing multiple criteria simultaneously. The choice of crossover operator is very important in the aspect of genetic algorithms (GA), and consequently a wide range of crossover operators have been proposed for JSSP. Most of them represent a solution by a chromosome containing the sequence of all the operations and decode the chromosome to a real schedule from the first gene to the last gene. However, these methods introduce high redundancy at the tail of the chromosome. In this paper, we address this problem in case of precedence preservation crossover (PPX) which is regarded as one of the better crossover operators and propose an improved version, termed as improved precedence preservation crossover (IPPX). Experimental results reveal that our proposed approach finds the near-optimal solutions by optimizing multiple criteria simultaneously with better results and also reduces the execution time significantly. © 2010 The Author(s).

Cite

CITATION STYLE

APA

Ripon, K. S. N., Siddique, N. H., & Torresen, J. (2011). Improved precedence preservation crossover for multi-objective job shop scheduling problem. Evolving Systems, 2(2), 119–129. https://doi.org/10.1007/s12530-010-9022-x

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free