Pengendalian Risiko pada Pekerjaan Block Assembly Proyek Barge Mounted Power Plant Menggunakan Job Hazard Analysis

  • Adika Pratama
  • Restu Hikmah Ayu Murti
N/ACitations
Citations of this article
23Readers
Mendeley users who have this article in their library.

Abstract

A Barge Mounted Power Plant (BMPP) is a floating power generation technology based on a ship that converts solar fuel and dual fuel gas into electrical energy. The manufacturing process involves assembling separate parts and combining them into larger sections, which increases the risk of workplace accidents. According to data from the BPJS Employment Accident Insurance program in 2021, there were 234,270 workplace accidents. The purpose of this study is to (1) identify potential hazards and risks that may occur and (2) control the risks associated with each process activity to ensure that the work is performed safely. The research method used is a qualitative descriptive approach based on risk analysis using job hazard analysis. The results of this study identified five types of hazards: psychological, mechanical, physical, ergonomic, and environmental. In conclusion, this study identified 13 process activities and 39 potential hazards and risks, and proposed measures to control the risks.

Cite

CITATION STYLE

APA

Adika Pratama, & Restu Hikmah Ayu Murti. (2023). Pengendalian Risiko pada Pekerjaan Block Assembly Proyek Barge Mounted Power Plant Menggunakan Job Hazard Analysis. INSOLOGI: Jurnal Sains Dan Teknologi, 2(3), 468–475. https://doi.org/10.55123/insologi.v2i3.1895

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free