Application of Numerical Design Structure Matrix Method in Engineering Projects Management

  • Gunawan I
N/ACitations
Citations of this article
10Readers
Mendeley users who have this article in their library.

Abstract

In this paper, ways of improving planning, execution and management of projects using Numerical Design Structure Matrix (NDSM) method are presented to address interdependency of feedback and iteration, which is common in engineering projects management. The NDSM is an alternative approach to traditional project management tools such as Program Evaluation and Review Technique (PERT), Critical Path Method (CPM), and Gantt chart that can only allow the modelling of sequential and parallel processes in projects. As a case study, the model is tested on a set of tasks in a complex petroleum oil field development project, where task sensitivity and information variability attributes are derived. By applying the NDSM method, project duration is optimized and hence total cost of the project is reduced significantly.

Cite

CITATION STYLE

APA

Gunawan, I. (2014). Application of Numerical Design Structure Matrix Method in Engineering Projects Management. Operations and Supply Chain Management: An International Journal, 1–10. https://doi.org/10.31387/oscm030015

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free