Abstract
The extraction of the Bełchatów lignite deposit located in the vicinity of the Debina salt dome requires careful planning that considers the influence of mining projects on the slope and salt dome stability conditions. The instability problem is directly related to horizontal and vertical displacement, as well as the complex geological and mining conditions. These conditions are very unique with regard to the co-occurrence of the salt dome and lignite deposits in the same area, as well as the large scale of the pit wall slope. Thus, predicting rock mass behavior and ensuring the safety of mining operations are important issues. The presented analysis focused on the influence of long-term lignite extraction on the western pit wall slope of the Bełchatów field and the salt dome's stability conditions. This study offers a comprehensive approach to a complex geotechnical problem defined by large-scale, complex geometry, and geological conditions. The rock mass behavior and stress conditions are simulated in numerical modelling. The results of the presented analysis will be useful not only for present mining activities but also for future developments related to post-mining and recultivation plans.
Author supplied keywords
Cite
CITATION STYLE
Cała, M., Cyran, K., Jakóbczyk, J., & Kowalski, M. (2020). The challenges of open-pit mining in the vicinity of the salt dome (Bełchatów Lignite deposit, Poland). Energies, 13(8). https://doi.org/10.3390/en13081913
Register to see more suggestions
Mendeley helps you to discover research relevant for your work.