Abstract

Long and unstandardized setup times are a major source of inefficiency in the cardboard packaging production process, particularly on the Flexo 4 machine, which requires 1.5 to 2 hours for setup. This study aims to reduce setup time by implementing the SMED (Single-Minute Exchange of Dies) method. Three internal activities—ink retrieval, material preparation, and plate preparation—were converted into external activities, reducing setup time by up to 66.67%. Observations were made on three work groups during shift 1, with average setup times ranging from the longest to the shortest: Group C (33.9 minutes), Group A (32.3 minutes), and Group B (30.05 minutes). ANOVA results show no significant differences between the groups. The longest setup time occurred in Group C, with 7,500 pcs and 4 plates, taking 75 minutes. This was due to the Mounting Plate process and limited operator resources.

Cite

CITATION STYLE

APA

Riyanti, P. D., & Amalia, A. (2025). Setup Time Measurement on Flexo 4 Using The Single-Minute Exchange of Dies (SMED) Method in a Multi-Group Cardboard Production Setting. Jurnal Teknik Industri Terintegrasi, 8(2), 2048–2058. https://doi.org/10.31004/jutin.v8i2.44790

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free