Treatment of combined coffee processing wastewater using constructed wetland/Cyperus-ustulatus and Typha-latifolia plants process

5Citations
Citations of this article
18Readers
Mendeley users who have this article in their library.

Abstract

This research investigated wastewater discharges from wet coffee processing plant (WCPP) combined with tap water (TW) treated by using Cyperus-ustulatus plant (P1), Typhalatifolia plant (P2) wetland. The WCPP wastewater was conducted by different combination of treatments (i.e. 100%WW + 0% TW; 75% WW + 25% TW; 50% WW + 50% TW; 75%WW + 25% TW and 0% WW + 100% TW) after being irrigated for 21 days in the constructed wetland with P1, P2and control (without a plant). The highest value of total solids, chemical oxygen demand and biochemical oxygen demand increases were 76%, 95% and, 96%, respectively, removed wastewater treated by T3 (50% WW + 50% TW) with P2 wetland after 21 days irrigated. As a result, the combination of coffee wastewater with constructed wetland treatment methods was a low-cost, affordable, technically viable and eco-friendly treatment option for the wet coffee processing plant wastewater.

Cite

CITATION STYLE

APA

Samuel, Z. A. (2021). Treatment of combined coffee processing wastewater using constructed wetland/Cyperus-ustulatus and Typha-latifolia plants process. Global Nest Journal, 23(3), 429–433. https://doi.org/10.30955/gnj.003688

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free