Insertion of 275 kV Transmission Line for Improving the Voltage Profile and Efficiency of Electrical Power System

4Citations
Citations of this article
41Readers
Mendeley users who have this article in their library.
Get full text

Abstract

The location of electricity generation generally lies in the centers of renewable energy sources which are generally far from urban centers, such as in the province of South Sulawesi, Indonesia. This condition becomes a separate issue related to the quality of the voltage and the efficiency of the electrical system that uses 150 kV transmission lines to transmitted electrical energy from the power plants. Therefore, to avoid waste and lack of quality electricity, it is necessary to insert a new transmission line from these power plants to the city of Makassar. Where the transmission line built is 275 kV transmission line because it increases the voltage profile and is efficient compared to 150 kV transmission line even though the network is added to the bank's capacitor. Therefore, this paper shows the reasons why a 275 kV transmission line was chosen for the improvement of voltage and reduction of power losses in South Sulawesi system.

Cite

CITATION STYLE

APA

Kitta, I., Manjang, S., Sahali, I. R., & Maricar, F. (2019). Insertion of 275 kV Transmission Line for Improving the Voltage Profile and Efficiency of Electrical Power System. In IOP Conference Series: Materials Science and Engineering (Vol. 676). IOP Publishing Ltd. https://doi.org/10.1088/1757-899X/676/1/012006

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free