Two hybrid flow shop scheduling lines with assembly stage and compatibility constraints

4Citations
Citations of this article
11Readers
Mendeley users who have this article in their library.

Abstract

Two hybrid flow shop scheduling lines must be coordinated to assemble batches of terminated products at their last stage. Each product is thus composed of two jobs, each produced in one of the lines. The set of jobs is to be processed in a series of stages to minimize the makespan of the scheduling, but jobs forming a product must arrive at the assembly line simultaneously. We propose a mixed integer linear programming model. Then, based on the model, we propose a pull-matheuristic algorithm. Finally, we present two metaheuristics, a greedy randomized adaptive search procedure and a biased random key genetic algorithm, and compare all the methodologies with real-based instances of a production scheduling problem in the automobile manufacturing industry. The greedy algorithm yields highquality solutions, while the genetic one offers the best computational times.

Cite

CITATION STYLE

APA

Muñoz-Sánchez, R., Martínez-Salazar, I., González-Velarde, J. L., & Solís, Y. Á. R. (2024). Two hybrid flow shop scheduling lines with assembly stage and compatibility constraints. PLoS ONE, 19(6 June). https://doi.org/10.1371/journal.pone.0304119

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free