ANALISA EKONOMI RANCANGAN PLTS OFF-GRID PADA ADIDAYA WORKSHOP

  • Putra Ariantika I
  • Setiawan I
  • Sukerayasa I
N/ACitations
Citations of this article
55Readers
Mendeley users who have this article in their library.

Abstract

The PLTS Off-Grid design at the Adidaya Workshop as an additional power supplier is based on the load needs used for the equipment and operational on the workshop. PLTS Off-Grid features are economically likely to take a long time to make a profit. This study deals with the economic analysis of the PLTS Off-Grid system design using the Net Present Value (NPV) analysis method and aims to find out the comparison projections between output and output of the Off-Grid PLTS project at the Adidaya Workshop during the estimated life of PLTS will operate over 20 years. After the calculation, it was obtained that 1th Scenario using a variation of the solar panel capacity of 300 Wp with a battery of 540 Ah produced the largest RAB demand value worth Rp. by 286.038.441 While the smallest RAB requirement value is generated from 4th Scenario using a variation in solar panel capacity of 300 Wp with a 540 Ah battery worth Rp 252.093.730. The largest and the smallest NPV values are also generated by 1th and 4th Scenario with the NPV value of -Rp 316.734.509 and –Rp 251.285.665.

Cite

CITATION STYLE

APA

Putra Ariantika, I. P. D., Setiawan, I. N., & Sukerayasa, I. W. (2023). ANALISA EKONOMI RANCANGAN PLTS OFF-GRID PADA ADIDAYA WORKSHOP. Jurnal SPEKTRUM, 10(3), 78. https://doi.org/10.24843/spektrum.2023.v10.i03.p9

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free