Optimization of Earthmoving Operations Planning: A Novel Approach Considering Interferences

3Citations
Citations of this article
24Readers
Mendeley users who have this article in their library.

Abstract

The purpose of this paper is to present an optimization model for planning the distribution of materials in earthmoving operations, considering possible interferences between cut-and-fill sections such as rivers, vegetation, topographical features, or expropriations. The earth allocation problem incorporating interferences was modeled as a linear programming problem, aiming to minimize the total earthmoving cost while considering the constraints related to volume balance, construction project duration, and time for the release of traffic. The proposed linear programming model was run by an integrated system, using Excel for data analysis and IBM CPLEX as the optimizer. The mathematical model was evaluated by a sensitivity analysis and validated by a real-world project of a damaccess road in the state of Ceará, Brazil. The unit costs and productivity rates used in thefictional example and in the real-world application followed the referential cost system created byCeará's Secretariat of Infrastructure (SEINFRA-CE). The proposed optimization model achievedreasonable processing times for all tested applications, presenting itself as a viable and efficient option for planning earthmoving operations. Furthermore, the linear programming approach provideda 2.12% cost reduction for the real-world case study, when comparing the optimized solution and original budget. This study explored the problem of earth allocation with interferences using a linearprogramming approach, while avoiding complex modeling issues found in recent literature. As a result, this paper proposes a user-friendly optimization system that can be easily utilized by construction companies and departments.

Cite

CITATION STYLE

APA

De Lima, R. X., Nobre Júnior, E. F., & Fernandes, P. G. P. S. (2021). Optimization of Earthmoving Operations Planning: A Novel Approach Considering Interferences. Journal of Engineering, Project, and Production Management, 11(2), 158–168. https://doi.org/10.2478/jeppm-2021-0016

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free