In complex manufacturing systems, such as a semiconductor wafer fabrication facility (wafer fab), it is important to accurately predict cycle times and work-in-progress (WIP) levels. These key performance indicators are commonly predicted using detailed simulation models; however, the detailed simulation models are computationally expensive and have high development and maintenance costs. In this paper, we propose an aggregate modeling approach, where each work area, i.e., a group of functionally similar workstations, in the wafer fab is aggregated into a single-server queueing system. The parameters of the queueing system can be derived directly from arrival and departure data of that work area. To obtain fab-level predictions, our proposed methodology builds a network of aggregate models, where the network represents the entire fab consisting of different work areas. The viability of this method in practice is demonstrated by applying it to a real-world wafer fab. Experiments show that the proposed model can make accurate predictions, but also provide insights into the limitations of aggregate modeling.

Cite

CITATION STYLE

APA

Deenen, P. C., Middelhuis, J., Akcay, A., & Adan, I. J. B. F. (2024). Data-driven aggregate modeling of a semiconductor wafer fab to predict WIP levels and cycle time distributions. Flexible Services and Manufacturing Journal, 36(2), 567–596. https://doi.org/10.1007/s10696-023-09501-1

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free