Abstract
In minerals supply chains, medium term plans over time horizons from two weeks to two years are used not only to maximise throughput and identify bottlenecks, but also for scheduling crews, production and maintenance. These plans need to observe constraints like maintenance and production requirements, eet capacities, and dumping, loading and stockyard management at every site. Additionally, the iron ore supply chains considered in this paper also needs to deal with grade quality constraints. This introduces extra complexities in terms of non-linear constraints as the quality depends on the mixing ratio of ore from different sources. We present an optimisation tool that was developed for Rio Tinto Iron Ore for such planning. The tool provides optimal number of trains while taking into account all the system constraints and has already reduced total planning time significantly.
Author supplied keywords
Cite
CITATION STYLE
García-Flores, R., Singh, G., Ernst, A., & Welgama, P. (2011). Medium-term rail planning at Rio Tinto Iron Ore. In MODSIM 2011 - 19th International Congress on Modelling and Simulation - Sustaining Our Future: Understanding and Living with Uncertainty (pp. 311–317). https://doi.org/10.36334/modsim.2011.a3.garcia_flores
Register to see more suggestions
Mendeley helps you to discover research relevant for your work.