Abstract
This study used a discrete-element analysis to predict the excavation performance of a 7.73 m-diameter earth pressure balance (EPB) shield tunnel boring machine (TBM). The simulation mainly predicted several excavation performance indicators for the machine, under different operating conditions. The number of particles in the chamber and the chamber pressure varied, as the operating conditions changed during the simulated TBM excavation. The results showed that the compressive force, torque, and driving power acting on the TBM cutterhead varied with its rotation speed, increasing as the cutterhead rotation speed rose. The overall compressive force acting on all of the disc cutters and their impact wear increased linearly as the cutterhead rotation accelerated. The position of a disc cutter on the cutterhead had a particularly strong influence, with higher com-pressive forces experienced by the cutters closer to the center. In contrast, the gauge disc cutters at the transition zone of the cutterhead showed more wear than those elsewhere. The muck discharge rate and the driving power of the screw conveyor rose with increasing screw conveyor and cutter-head rotation speeds. Finally, this study suggests optimal operation conditions, based on pressure balance and operational management of the TBM.
Author supplied keywords
Cite
CITATION STYLE
Park, B., Lee, C., Choi, S. W., Kang, T. H., & Chang, S. H. (2021). Discrete-element analysis of the excavation performance of an epb shield tbm under different operating conditions. Applied Sciences (Switzerland), 11(11). https://doi.org/10.3390/app11115119
Register to see more suggestions
Mendeley helps you to discover research relevant for your work.