Shewhart control charts for dispersion adjusted for parameter estimation

46Citations
Citations of this article
16Readers
Mendeley users who have this article in their library.

This article is free to access.

Abstract

Several recent studies have shown that the number of Phase I samples required for a Phase II control chart with estimated parameters to perform properly may be prohibitively high. Looking for a more practical alternative, adjusting the control limits has been considered in the literature. We consider this problem for the classic Shewhart charts for process dispersion under normality and present an analytical method to determine the adjusted control limits. Furthermore, we examine the performance of the resulting chart at signaling increases in the process dispersion. The proposed adjustment ensures that a minimum in-control performance of the control chart is guaranteed with a specified probability. This performance is indicated in terms of the false alarm rate or, equivalently, the in-control average run length. We also discuss the tradeoff between the in-control and out-of-control performance. Since our adjustment is based on exact analytical derivations, the recently suggested bootstrap method is no longer necessary. A real-life example is provided in order to illustrate the proposed methodology.

Cite

CITATION STYLE

APA

Goedhart, R., da Silva, M. M., Schoonhoven, M., Epprecht, E. K., Chakrabortic, S., Does, R. J. M. M., & Veiga, Á. (2017). Shewhart control charts for dispersion adjusted for parameter estimation. IISE Transactions, 49(8), 838–848. https://doi.org/10.1080/24725854.2017.1299956

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free