Abstract
PT. Kereta Api Indonesia (Persero) has a measuring train that is used to determine the condition of the railroad tracks. The output of measuring train is a railroad quality value called the TQI (Track Quality Index). The TQI value can used to determine priority rail road maintenance. This study aims to determine the TQI category of the railroad between Semarang Poncol - Alastua, then determine improvement priorities and maintenance programs. The results of the analysis of the Semarang Poncol-Alastua cross-section railway data have an average category II for 20
Cite
CITATION STYLE
Prihatanto, R., Nurfaizin, B. A. B., Puspitasari, A., & Riyanta, W. (2023). Penentuan Prioritas Perawatan Berdasarkan Hasil Track Quality Index (TQI) Jalur Kereta Api Antara Stasiun Semarang Poncol – Stasiun Alastua. Media Ilmiah Teknik Sipil, 11(1), 74–81. https://doi.org/10.33084/mits.v11i1.4470
Register to see more suggestions
Mendeley helps you to discover research relevant for your work.