The Improved Least Square Support Vector Machine Based on Wolf Pack Algorithm and Data Inconsistency Rate for Cost Prediction of Substation Projects

17Citations
Citations of this article
12Readers
Mendeley users who have this article in their library.

This article is free to access.

Abstract

Accurate and stable cost forecasting of substation projects is of great significance to ensure the economic construction and sustainable operation of power engineering projects. In this paper, a forecasting model based on the improved least squares support vector machine (ILSSVM) optimized by wolf pack algorithm (WPA) is proposed to improve the accuracy and stability of the cost forecasting of substation projects. Firstly, the optimal features are selected through the data inconsistency rate (DIR), which helps reduce redundant input vectors. Secondly, the wolf pack algorithm is used to optimize the parameters of the improved least square support vector machine. Lastly, the cost forecasting method of WPA-DIR-ILSSVM is established. In this paper, 88 substation projects in different regions from 2015 to 2017 are chosen to conduct the training tests to verify the validity of the model. The results indicate that the new hybrid WPA-DIR-ILSSVM model presents better accuracy, robustness, and generality in cost forecasting of substation projects.

Cite

CITATION STYLE

APA

Wang, H., Liang, Y., Ding, W., Niu, D., Li, S., & Wang, F. (2020). The Improved Least Square Support Vector Machine Based on Wolf Pack Algorithm and Data Inconsistency Rate for Cost Prediction of Substation Projects. Mathematical Problems in Engineering, 2020. https://doi.org/10.1155/2020/6663006

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free